Problems of implementation of regional capital repair programs (on the example of the Rostov region)
Abstract
Problems of implementation of regional capital repair programs (on the example of the Rostov region)
Incoming article date: 16.01.2020Improving the quality characteristics of the operated housing stock, today, is one of the urgent tasks. The mechanism for solving this problem is the ongoing regional capital repair programs. The basis of an effective capital repair program should be reliable data on the actual technical condition of the facilities, allowing you to determine the required list of types of work, as well as the cost. However, despite significant results, a number of problems have been identified. The article highlights the technical and strategic problems of implementing capital repair programs, and defines the features of performing repair work on cultural heritage sites. This information will allow us to create programs that take into account not only the specifics and degree of deterioration of the region's housing stock, but also to create a system of resource provision for the medium term, assuming the achievement of the target values.
Keywords: Major repairs, organization of work, capital repair program, period of work, monitoring, wear and tear, shortage of specialists, modeling, technical condition, production