About formation of life cycle model of underground structure
Abstract
About formation of life cycle model of underground structure
Incoming article date: 09.10.2021This article discusses the approach being developed, the option of life cycle formation using the example of underground structure. The most recent life cycle model used in foreign countries is considered. And based on this model, the developed scheme of the life cycle model of the underground structure is presented.
Keywords: Life cycle, BIM, TIM, underground facilities, modeling, information construction, redevelopment, monitoring, GIS