The improvement of preparative processes during the earthworks on the linear main pipeline portion

Abstract

The improvement of preparative processes during the earthworks on the linear main pipeline portion

Akhmedov A. M.

Incoming article date: 27.12.2016

The article proposes a special device which enables to improve the preparative processes during the main pipeline break at any technique of general maintenance or trench breaking. The device has been made to fix characteristic points on the surface of the earth. The application will enable to exclude the use of stakes or pegs driven into the ground. The device allows to continuously mark the space without stopping the machine to apply a special mix. The use of the marking on portions of pipeline bends will enable to cut the volume of the ground extracted from the trench and therefore to reduce the length of stripping. The application of the device will allow to improve the preparative processes prior to stripping works. The use of the proposed device will give the opportunity of its application in all the climatic conditions nationwide.

Keywords: Akhmedov A. M.