Organizational and technological solutions for establishing relationships between the parameters of the construction flow when breaking down the overall work front
Abstract
Organizational and technological solutions for establishing relationships between the parameters of the construction flow when breaking down the overall work front
Incoming article date: 09.03.2025In this scientific article, the issues of the interrelationships of flow parameters during the process of breaking down the general front of construction work, operations and related processes were considered. The main flow factors that have an impact on the time and duration of work are the number of private fronts (seizures), the time period, and the number of variations in the construction work itself. In this paper, the procedure for establishing the interrelationships of various parameters of molasses was considered in detail. According to the conclusions of the analysis, it was found that, taking into account the fact that the design of the calendar plan does not take into account the time intervals allocated for super-simple activities and operations of upcoming subspecies of construction work, it is necessary to additionally take into account the progression of the intervals of deployment and curtailment of construction work flows (resource complexes, private flows) and frontal complexes. It is also proved that the determination of the interrelationships of the flow parameters is associated with the fragmentation of the type of work into individual processes, and the general front of construction work into private ones, while the duration of the processes from which the schedule of work is formed is the main assessment of the effectiveness of the calendar plan.
Keywords: organizational and technological solutions, reliability, quality control, efficiency, cost, labor productivity